Board for Public Sector Transformation
Project wise achievements
TRACO-CCV line (dry cure technology) for the manufacture of UG and AB cables of voltage range 11/33/66 KV at Thiruvalla unit of Traco Cable Company Ltd
-
Project Start Date
2021-11-01
-
Project Cost
1600.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-11-01
-
Physical Progress
66.2 %
-
.
KCCL-Supercapacitor Production Facility
-
Project Start Date
2021-01-13
-
Project Cost
1800.0 lakhs
-
Category
Mega Projects
-
Project End Date
2022-12-13
-
Physical Progress
57.75 %
-
.
SIFL- Modernization Project
-
Project Start Date
2021-09-06
-
Project Cost
1782.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2024-03-21
-
Physical Progress
81.25 %
-
.
SILK- 3. Installation of Machines in SILK Foundry Unit, Ottapalam
-
Project Start Date
2021-06-26
-
Project Cost
570.71 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-12-26
-
Physical Progress
99.5 %
-
.
KSIE-Modernization of Container Freight Station (CFS)
-
Project Start Date
2021-10-01
-
Project Cost
300.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2024-03-31
-
Physical Progress
96.67 %
-
.
KSIE-KERALA SOAPS-Setting up of Plant and Machinery for manufacturing of Liquid Hand wash Soaps in Kerala Soaps
-
Project Start Date
2021-09-30
-
Project Cost
250.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2024-03-31
-
Physical Progress
98.0 %
-
.
KECL-Development and Production of Vibration Isolator for Industrial Applications
-
Project Start Date
2022-01-01
-
Project Cost
50.0 lakhs
-
Category
Mega Projects
-
Project End Date
2023-03-31
-
Physical Progress
66.67 %
-
.
FIT - INSTALLATION OF HORIZONTAL BANDSAW MACHINE
-
Project Start Date
2022-02-02
-
Project Cost
60.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-08-02
-
Physical Progress
66.67 %
-
.
UEIL-Manufacture of Polymer Insulator
-
Project Start Date
2021-09-15
-
Project Cost
216.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-07-15
-
Physical Progress
100.0 %
-
.
KELTRON-Manufacturing Medical Equipment, Augmentation of SPG
-
Project Start Date
2021-07-01
-
Project Cost
463.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-03-31
-
Physical Progress
71.18 %
-
.
UEIL-UPGRADATION OF MOTOR STARTER
-
Project Start Date
2021-09-15
-
Project Cost
61.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-04-20
-
Physical Progress
100.0 %
-
.
SIFL - Expansion of Shoranur Machining Unit
-
Project Start Date
2021-12-20
-
Project Cost
565.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-11-19
-
Physical Progress
100.0 %
-
.
KMML-Compact and Energy Efficient Tickle Pre-heaters
-
Project Start Date
2023-03-22
-
Project Cost
2150.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2025-03-20
-
Physical Progress
0.0 %
-
.
KMML- Liquid Nitrogen Storage
-
Project Start Date
2020-05-26
-
Project Cost
495.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-05-26
-
Physical Progress
100.0 %
-
.
KMML- Addiitonal cooling tower
-
Project Start Date
2020-10-18
-
Project Cost
950.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-06-21
-
Physical Progress
95.94 %
-
.
KMML-New Brine Chilling Compressor System
-
Project Start Date
2020-12-11
-
Project Cost
300.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-08-11
-
Physical Progress
98.33 %
-
.
LVP/SVP AND OPHTHALMIC PLANT COMPLETION OF PROJECT
-
Project Start Date
2019-10-30
-
Project Cost
5887.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
73.5 %
-
.
KELTRON-Modernization of Production facilities AS Revalidated
-
Project Start Date
2019-07-01
-
Project Cost
535.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
69.69 %
-
.
TTPL- Modernisation projects- Copperas Recovery Plant
-
Project Start Date
2018-03-31
-
Project Cost
1550.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2021-03-31
-
Physical Progress
96.94 %
-
.
SILK- 4. Installation of Machines in SILK GEW Unit, Thuravoor
-
Project Start Date
2021-06-26
-
Project Cost
129.29 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-12-26
-
Physical Progress
87.0 %
-
.
SILK- 2. Drydocking Slipway at SILK Azhikkal Unit
-
Project Start Date
2020-06-15
-
Project Cost
450.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-11-15
-
Physical Progress
95.71 %
-
.
SILK- 1. Modernisation of SILK SFU Unit, Cherthala
-
Project Start Date
2020-06-15
-
Project Cost
300.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2021-12-15
-
Physical Progress
100.0 %
-
.
MALABAR CEMENTS LIMITED -Bulk Cement Terminal & Allied Material Handling and Logistics Hub at Cochin Port trust (CPT)
-
Project Start Date
2022-02-15
-
Project Cost
16655.0 lakhs
-
Category
Construction
-
Project End Date
2024-02-15
-
Physical Progress
33.33 %
-
.
INTEGRATED COCONUT AND FRUIT PROCESSING COMPLEX
-
Project Start Date
2019-05-15
-
Project Cost
650.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-05-15
-
Physical Progress
100.0 %
-
.
KCCP-FUEL RETAIL OUTLETS
-
Project Start Date
2022-03-01
-
Project Cost
280.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-11-01
-
Physical Progress
25.0 %
-
.
Modernisation
-
Project Start Date
2022-03-15
-
Project Cost
250.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-15
-
Physical Progress
100.0 %
-
.
PRELIMINARY WORKS IN ONCOLOGY PARK
-
Project Start Date
2021-01-11
-
Project Cost
300.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-12-31
-
Physical Progress
85.0 %
-
.
KSDP-NON BETALACTAM PROJECT
-
Project Start Date
2017-08-10
-
Project Cost
3794.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-12-31
-
Physical Progress
98.0 %
-
.
HDCK-Karakausala Sauhrida Padhathi
-
Project Start Date
2021-10-30
-
Project Cost
300.0 lakhs
-
Category
Mega Projects
-
Project End Date
2022-03-30
-
Physical Progress
100.0 %
-
.
KMML- 5 TPH Pressure Filtration and Drying System
-
Project Start Date
2021-06-05
-
Project Cost
9000.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-10-05
-
Physical Progress
73.86 %
-
.
TCSM-NCDC Assisted Rehabilitation cum Modernisation and Expansion programme of Trichur Co-operative Spinning Mills ltd
-
Project Start Date
2015-03-27
-
Project Cost
2997.78 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-06-27
-
Physical Progress
93.42 %
-
.
KSTC - Value addition through installation of Autoconer at Prabhuram Mills
-
Project Start Date
2022-02-14
-
Project Cost
395.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-02-14
-
Physical Progress
13.06 %
-
.
KSTC-Value addition in Malabar Spiniing & Weaving Mills, Kozhikode
-
Project Start Date
2022-02-14
-
Project Cost
599.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-02-14
-
Physical Progress
58.67 %
-
.
KSTC-Komalapuram Spinning & Weaving Mills, Alappuzha
-
Project Start Date
2022-02-03
-
Project Cost
273.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
91.33 %
-
.
KSTC-Hi-tech Weaving Mills, Pinarayi
-
Project Start Date
2022-03-15
-
Project Cost
108.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-15
-
Physical Progress
9.93 %
-
.
KSTC- Uduma Textile Mills, Kasargode
-
Project Start Date
2022-02-03
-
Project Cost
140.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
100.0 %
-
.
KSTC-Modernization of CARDT
-
Project Start Date
2022-03-15
-
Project Cost
415.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-15
-
Physical Progress
0.0 %
-
.
KAL-Expansion and Modernisation of facilities for manufacturing E-Auto, E-Rickshaw & E-Scooter
-
Project Start Date
2021-11-15
-
Project Cost
816.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-11-15
-
Physical Progress
74.71 %
-
.
KAL-New factory at Pinarayi, Kannur for assembling of electric vehicles manufactured by Kerala Automobiles Ltd
-
Project Start Date
2021-09-30
-
Project Cost
350.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-09-30
-
Physical Progress
20.45 %
-
.
KKMCSM-Modernization
-
Project Start Date
2022-03-01
-
Project Cost
100.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-03-31
-
Physical Progress
0.0 %
-
.
SIDCO-MODERNIZATION OF 8 PRODUCTION UNITS OF SIDCO
-
Project Start Date
2021-07-09
-
Project Cost
249.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-03-31
-
Physical Progress
100.0 %
-
.
TRAVANCORE CEMENTS LTD- 400TPD GREY CEMENT GRINDING UNIT
-
Project Start Date
2022-01-10
-
Project Cost
957.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2024-01-10
-
Physical Progress
22.57 %
-
.
TRAVANCORE CEMENTS LTD.- POLE CASTING UNIT
-
Project Start Date
2022-11-01
-
Project Cost
591.85 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2024-05-01
-
Physical Progress
66.67 %
-
.
KCCL - Expansion and Modernization of Capacitor Production Facility
-
Project Start Date
2021-06-03
-
Project Cost
300.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
85.11 %
-
.
MIL-Installation of 3T Hammer and other modernisation works
-
Project Start Date
2020-08-15
-
Project Cost
492.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-12-15
-
Physical Progress
49.71 %
-
.
MIL-Setting up of Regional Depots/Show rooms
-
Project Start Date
2022-05-16
-
Project Cost
100.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-11-15
-
Physical Progress
44.0 %
-
.
AKL- INSTALLATION OF 2MW SOLAR POWER PLANT IN THE PREMISES OF AUTOKAST LTD
-
Project Start Date
2020-08-28
-
Project Cost
1033.0 lakhs
-
Category
Mega Projects
-
Project End Date
2023-06-21
-
Physical Progress
70.36 %
-
.
kaithari Suraksha Scheme
-
Project Start Date
2022-01-20
-
Project Cost
110.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-03-31
-
Physical Progress
100.0 %
-
.
RENOVATION OF INDUSTRIAL ESTATE SIDCO
-
Project Start Date
2021-02-17
-
Project Cost
501.0 lakhs
-
Category
Construction
-
Project End Date
2021-08-30
-
Physical Progress
100.0 %
-
.
TELK-VAPOUR PHASE DRYING SYSTEM
-
Project Start Date
2022-05-30
-
Project Cost
1100.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-05-30
-
Physical Progress
0.0 %
-
.
TKCL- PRODUCTION CAPACITY STABILIZATION - 1500MT PER MONTH
-
Project Start Date
2021-10-01
-
Project Cost
700.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
80.71 %
-
.
KEL - MODERNISATION & EXPANSION OF KUNDARA & MAMALA UNITS
-
Project Start Date
2017-08-03
-
Project Cost
1800.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-12-03
-
Physical Progress
77.8 %
-
.
Bamboo-'Production of Bamboo Based Green Protocol Office Equipment'
-
Project Start Date
2021-06-27
-
Project Cost
250.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2022-06-27
-
Physical Progress
0.0 %
-
.
ECO FRIENDLY BRICK MANUFACTURING FROM MOULDING SAND WASTE
-
Project Start Date
2021-09-24
-
Project Cost
56.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-05-08
-
Physical Progress
91.25 %
-
.
AUTOKAST-MODERNISATION PROJECT
-
Project Start Date
2021-03-01
-
Project Cost
1134.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-06-30
-
Physical Progress
16.17 %
-
.
MODENIZATION AND EXPANSION OF PLANT AND MACHINERY
-
Project Start Date
2020-12-26
-
Project Cost
600.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2024-03-26
-
Physical Progress
80.22 %
-
.
Comprehensive Revival Scheme of Co-Operative Spinning Mills (Under TEXFED)- Alleppey Co-Operative Spinning Mills Ltd
-
Project Start Date
2022-02-04
-
Project Cost
230.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-02-04
-
Physical Progress
42.86 %
-
.
CCSM - COMPLETION OF CURRENT NCDC ASSISTED MORDERNISATION PROGRAMME
-
Project Start Date
2021-04-01
-
Project Cost
1750.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-31
-
Physical Progress
97.91 %
-
.
MALCOTEX-Mordernisation of Malcotex
-
Project Start Date
2021-11-01
-
Project Cost
150.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-01-01
-
Physical Progress
100.0 %
-
.
Rejuvenation and Revival of Viable PSUs - Fund Support to PRICO for Modernization
-
Project Start Date
2022-01-13
-
Project Cost
115.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-04-13
-
Physical Progress
100.0 %
-
.
MCSM-Comprehensive Revival Scheme for Cooperative Spinning mills
-
Project Start Date
2021-08-27
-
Project Cost
175.0 lakhs
-
Category
Mega Projects
-
Project End Date
2023-01-30
-
Physical Progress
100.0 %
-
.
NCDC Comprehensive Revival Scheme for Co-operative Spinning Mills - QCSM Ltd
-
Project Start Date
2021-09-09
-
Project Cost
500.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2022-03-31
-
Physical Progress
100.0 %
-
.
KEL - MANUFACTURE OF ELECTRIC VEHICLE MOTORS AT KUNDARA UNIT
-
Project Start Date
2020-07-15
-
Project Cost
1000.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2023-04-30
-
Physical Progress
37.54 %
-
.
KSTC- Technology upgradation in Edarikkode Textiles
-
Project Start Date
2022-03-03
-
Project Cost
372.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2023-03-03
-
Physical Progress
12.5 %
-
.
Desiltation of Meenkara DAM on Turn Key basis
-
Project Start Date
2022-01-19
-
Project Cost
7461.0 lakhs
-
Category
Mega Projects
-
Project End Date
2023-01-19
-
Physical Progress
66.67 %
-
.
TTPL- Modernization of Titanium Dioxide plant, Neutralization Plant
-
Project Start Date
2022-04-01
-
Project Cost
16838.0 lakhs
-
Category
Modernization of PSUs
-
Project End Date
2026-04-01
-
Physical Progress
60.1 %
-
.
Dredging and Beach Sand Mining at Palakkod,Valiyakadappuram
-
Project Start Date
2020-03-21
-
Project Cost
968.0 lakhs
-
Category
Mega Projects
-
Project End Date
2022-08-31
-
Physical Progress
87.24 %
-
.
Desiltation of Walayar DAM on Turn Key basis
-
Project Start Date
2021-10-01
-
Project Cost
7213.0 lakhs
-
Category
Mega Projects
-
Project End Date
2024-10-01
-
Physical Progress
70.0 %
-
.
SETTING UPOF ONCOLOGY PARK
-
Project Start Date
2022-03-01
-
Project Cost
15000.0 lakhs
-
Category
Mega Projects
-
Project End Date
2025-03-01
-
Physical Progress
0.0 %
-
.
TTPL- New Diversified Projects - Manufacture of Red ,Yellow and Black Oxide from ferrous sulphate solution
-
Project Start Date
2022-08-01
-
Project Cost
13061.0 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2025-08-30
-
Physical Progress
5.99 %
-
.
TTPL- New Diversified Projects - Manufacturing of Plaster of Paris from White Gypsum
-
Project Start Date
2022-07-23
-
Project Cost
5478.36 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2025-08-30
-
Physical Progress
7.69 %
-
.
TTPL- New Diversified Projects- Manufacture of Catalytic Titanium Dioxide, Coloured Pigments, Lithium Titanate and Pearl pigment from Titanium Dioxide.
-
Project Start Date
2022-08-02
-
Project Cost
5261.68 lakhs
-
Category
Expansion/Diversification of PSUs
-
Project End Date
2025-08-30
-
Physical Progress
6.25 %
-
.